In use
NB The 2020 edition of the RIBA Plan of Work has renamed this stage 'Use'.
The process for completing the design and construction of a building is often divided into notional ‘stages’. This can be helpful in establishing milestones for the submission of progress reports, the preparation of information for approval, client gateways, and for making payments. However there is a great deal of ambiguity between the naming of stages by different organisations and the definition of what individual stages include (see comparison of work stages) and so it is important that appointment documents make it clear specifically what activities fall within which stage, and what level of detail is required.
‘In use’ was a new phrase coined by the Royal Institute of British Architects (RIBA) for the 2013 Plan of Work. This plan comprised eight work stages:
- 0 - Strategic definition.
- 1 - Preparation and brief.
- 2 - Concept design.
- 3 - Developed design.
- 4 - Technical design.
- 5 - Construction.
- 6 - Handover and close out.
- 7 - In use.
Stage 7, ‘In Use’ was described by the RIBA as a new stage within the Plan of Work which includes post-occupancy evaluation and post-project review as well as ‘…new duties that can be undertaken during the In Use period of a building.’ Some of these services were previously included in the stages L2: Initial Occupation Services and L3: Post Occupancy Evaluation Services.
The 2020 edition of the RIBA Plan of Work has renamed this stage 'Use'. It suggests that: 'On the majority of projects, the design team and construction team will have no Stage
7 duties to undertake.'
However consultants might provide advice to the client post construction in relation to:
- Letting.
- Rating.
- Maintenance.
- Energy consumption and energy certificates.
- Insurance.
- Tenants queries.
- Facilities management.
- The preparation of tender documents for maintenance and operation contracts.
- Post occupancy evaluation.
- Facilities management.
[edit] Related articles on Designing Buildings Wiki
- Occupation.
- Comparison of work stages.
- Defects liability period.
- Designing Buildings Wiki Project plans.
- Developed design.
- Performance gap.
- Performance in use.
- Post-occupancy evaluation.
- Post-project review.
- RIBA Plan of Work.
- Soft landings.
[edit] External references
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CLC publishes Mental Health Joint Code of Practice.
A quick introduction to its uses and risks.
Construction Management, 17 June
Government rolls out digital planning tool to all local authorities.
Your views needed - a strategy for the professions, trades and occupations.
Confronting competency, codes, capacity and costs.
The hidden risk in modern construction supply chains.
Construction Management, 10 June
24 months to 14: CITB launches accelerated apprenticeships.
Bridging the gap between clients and contractors
Concerns remain around contractor quality, capability, and delivery.
Construction Management, 10 June.
Heat pumps beat boilers in new home tests.
Building Safety Act implementation in Wales
CIAT to host industry panel on 26 June.
New and updated CLC building safety guidance.